Allana Buick & Bers was retained for two phases of an Operational Data Center expansion for a confidential client in Santa Clara.

The work was performed in an active co-locational facility, which housed multiple tenants. As there could not be any interruptions to our clients or the other occupants, diligent measures were performed in clean work procedures. Phasing, scheduling and protection of existing facilities were carefully coordinated with the client and building engineers, so disruptions to services occurred.

Work included design, engineering, permitting and construction of the data center expansion. Allana Buick & Bers also assisted with structural, mechanical, and electrical components such as structural steel super frames for cable and electrical power distribution support, new electrical distribution, cold isle containment, rack installation with seismic supports, cable tray for data cable, Starline power distribution, fire alarms and fire sprinklers.